Wednesday 17 October 2012

A Short Back and Sides


Yesterday the building of the new potting shed started, two panels were constructed that would form the back when joined together. However, this morning when they were put in place, they were too short so an extra section had to be made to attach them together.


The next step, before attaching the back to the base, was to line it with a breather membrane, highly breathable and waterproof, then nail the feather edge board to the outside.


Whilst Ady and Simon covered the back with the feather edge, Kieron built the two sides, by the end of the day the back, two sides and front were in place.


No comments:

Post a Comment