Wednesday, 29 January 2014

Weed Suppressing Membrane With Gravel On Top



Following on from where they left off on Monday, the team continued with the creation of a low maintenance area at the back of the Lindbury Building.


The heavy roll of weed suppressing membrane was manoeuvred in place and carefully cut into pieces around the many drain covers.




Once the required area had been covered with the membrane it was fixed in place with plastic turf pegs, covered in gravel and a wooden edge fixed in place.


No comments:

Post a Comment