With all the membrane down, it's time to cover it with ten tonnes of shingle, three lorry loads. Simon read Ali's mind as she watched the lorry deliver its load, her worst nightmare, not being a huge fan of shingle.
Due to the sports ground still be frozen, Andy and Gary came to join us this morning shovelling and transporting the shingle.
By lunch time all the shingle had been levelled, leaving just the area next to where Kieron was working.
The last task, to lay a new stone edge leading from the white gate to the front door.
No comments:
Post a Comment