In the walled garden, where the team have been working in over the last three days, an old compost bay wall needed to be rebuilt.

The wall on the left of the bay had collapsed, so Simon and Ali found enough old bricks in an adjoining garden, a very large future project, and rebuilt it. On the right hand side, new posts were added to the existing wall so that the entrance slats could be slotted in, the left hand posts will have to wait until the cement has dried.

Just outside the walled garden, Ady noticed that the front edge of a large step had collapsed, so with Graham's assistance, they rebuilt it.