Many of the overhanging branches have been cut back and, with the help of Matt and Dwayne from the maintenance team, all the leaves removed from the roof. Matt and Dwayne also then spent time power washing all the grime from the paving area directly outside the building as well as the cobwebs and dirt from the eaves.
New shingle was added to edge the paving and the tarmac paths swept clean once all the borders had been mulched. The lawn was then mown and edged, the new tropical bed cut down
and a mulch added, then the york stone path leading to the building hosed off to remove any dirt.
No comments:
Post a Comment